These pictures are all from 20th October 2012, after electrical and plumbing rough in but before the dry wall was installed. The goal is to show where everything is, with a tape measure for reference to make it possible to work out where to drill, or not to drill as the house is added to in the future.
The pictures vary enormously in quality - the whole operation turned out to be much more difficult and time consuming than we had anticipated. Each compass direction is separated out - when the picture is headed "north" it means that the picture was taken facing north. Roughly speaking, the pictures run from left to right along each wall.
Be aware that the thumbnails link to full resolution images (4320 x 3240 pixels) so that the images can be zoomed to the point where the markings on the tape are visible. Most rooms also have a video panorama to give an overall picture of the room.